- Operation MS4 knows what needs to be tracked to compile appropriate information for the Monthly Construction Site Reports, Annual Reporting and Permit Renewal required by the Rule. Program Description and regulatory mechanism information for each MCM may be customized. Print Simply by clicking a button.
- Programmatic Indicators and typical Best Management Practices pre-loaded with ability to add new ones. MCMs, BMPs, PIs combine to determine measurable goals and documentation requirements.
- All required information needed for reporting and Rule compliance is centrally located and easily retrievable. Elements may be modified annually as part of the Annual Reporting process, or, with Operation MS4, regular updates may be integrated into the daily activities affected by the SWQMP.
- Many activities can be tracked for each site: Active permits, inspection history, enforcements, Non-structural and/or Structural BMPs included on the site.
- O&M documents can be linked as well as inspection reminders or alerts as desired.
- Once adequate, a permit may be issued and notification with Permit and NOI attached may be sent to owner/preparer.
- Pre loaded Reports in PDF form for printing or sending via email.